top of page
Logo EU no background.png
Logo EU no background.png
Search

Breakthrough Stampelva

  • Writer: Norhard AS
    Norhard AS
  • Apr 14, 2021
  • 1 min read

Updated: May 19, 2021

Last week we completed the drilling at Stampelva. The length of the tunnel is 1521 meters, drilled with a diameter of 0,78 m.





 
 
 

コメント


bottom of page